Last time, I left you with the before pictures of our army bathroom. Here are some progress pictures to hold you over until I post the final after pictures.
We ripped everything out down to the studs and the subfloor. I hired a plumber to come in and move the toilet "hole" over about 4 inches from the bathtub because I felt that it was just too close for comfort. Other than that, DH and I have done everything ourselves.
As we don't have boys, this bathroom had to go. It was great to demo the entire thing and feel like something CLEAN would take its place.
Final after pictures will be posted sometime next week.
Pictures: Progress of Upstairs Bathroom
February 1st, 2012 at 02:46 pm
February 1st, 2012 at 03:55 pm 1328111708
February 1st, 2012 at 11:02 pm 1328137328
February 2nd, 2012 at 09:48 am 1328176088